Bordertown Transmission Line

This NV Energy project on Federal (USFS) and private lands consists of the construction, operation and maintenance of a 120-kV overhead transmission line between the existing Bordertown and California substations in Sierra County, California. It also includes modifications and improvements to substations and widening of existing roads and construction of new temporary access roads necessary for construction and maintenance of the proposed transmission line.


WBS has been tasked with obtaining baseline/existing conditions data (cover, species frequency), mapping of noxious and invasive weed populations, development of erosion control and re-vegetation specifications, construction oversight, and post-construction monitoring to verify that the project has met permit requirements.  To date we have obtained baseline cover data for four of the five plant communities within the project ROW.


Traducción Española:

Este proyecto de construcción de línea de transmisión eléctrica (120 kilovoltios) cruzará dos estados (California y Nevada) y suministrará energía eléctrica a la población creciente del norte de Nevada a través de la sub-estación ubicada en California. Asimismo, el sistema incluirá modificaciones y mejoras a los caminos de acceso existentes y construcción de nuevos caminos provisionales.


El papel de WBS hasta ahora ha sido llevar a cabo investigaciones de las condiciones existentes de derecho de vía, que incluye el tipo y porcentaje de vegetación, materia orgánica como ramas y corteza, y el porcentaje de grava y piedra. Esta información se utiliza en determinar las mejores prácticas de manejo, el control de erosión durante y después de construcción, y, por último, los componentes de revegetación y estabilización del suelo. Además, la información se usará para realizar medidas comparativas una vez finalizado el proyecto y habrá manera de determinar el nivel de éxito y cumplimiento de las reglas.

bottom of page